Roadmap

From governed core to governed economy.

Cyberellum advances on an evidence ladder — nothing is called live until it is proven. Statuses below reflect the current validated state of each system.

Foundation · Complete

Governance core validated Proven

AXIOM governance engine at TRL 6 — 105/105 governance tests passed. Cell 1 validation locked: adversarial, gate, and health suites all passing. Post-quantum cryptographic stack (ML-KEM-768, ML-DSA-65, SHA-384) operational across receipts.

Foundation · Complete

Ledger infrastructure live Live

Q-Chain private mainnet and public testnet with faucet operating on dedicated infrastructure. DID-addressed actors; quantum entropy (ANU QRNG) in the key pipeline.

Now · Operating

Cognitive layer integration Deployed

Cell 2 decision engine wired to GRLS governed memory and the Meta-Cognitive Engine. Real-time streaming transport connecting cells, agents, and operator surfaces.

Now · In build

Studio & agent workforce In build

G-IDE AI Studio and Agent Factory deployment: provisioning identity-bound production agents operated under Cell 2 admission, with the operator command surface (AMMO) as the single pane of control.

Next

Investor data vault & diligence surface In build

AI-concierge-guided data room with evidence-linked diligence materials — every platform claim traceable to test output, receipt, or artifact.

Next

RWA rails to first partners Designed

Tokenization of assets, IP, rights, and service credits with governed transfer and Plasma-Q settlement, opened to initial partner cohorts.

Horizon

Enterprise governance deployments Scoped

AXIOM governance-as-infrastructure for regulated enterprises: financial services, healthcare, and public sector — aligned to NIST AI RMF and EU AI Act obligations.

Status vocabulary: conceptual → designed → configured → deployed → live → proven → production-ready. A stage is only claimed when evidence exists; diligence materials in the data vault link each claim to its artifact.